Djabesmen Fiber Cement must be lifted / carried by two people, each at its end in a balanced manner. If the lift space is wide, Djabesmen Fiber Cement must be lifted / carried in a horizontal position.
Pay attention to the position of the finger, place the ring finger and the middle on the second or third rising wave of the tip, especially size 270 & 300. If the lift space is narrow, Djabesmen Fiber Cement must be lifted / carried in an upright position.
Jika ruang gerak sempit, Fiber Semen diangkat / dibawa dengan posisi tegak.