hero-page

Tips Installation

Tips Installation

Tips Installation

1. Put a layer of rubber on the nails that are installed, to avoid leaks.

2. Nailing the fiber cement roof is carried out at the peak of the second wave from the left and second from the right.

3. Avoid nailing in the middle of the wave to avoid leaks.

4. Avoid installing nails or nuts that are too hard on the fiber cement surface, because this can cause cracks.

5. The minimum final overlap for the recommended angle (min. 20 degrees) is 100 mm. The minimum overlap for small waves is 1.5 waves and for large waves and fiber cement roof tiles is 1 wave.

6. Use a truss roof frame made of wood, light steel, iron, or a material that has a strong, stiff and straight character.

7. Simple Roof Details :

Video

Strong and Sturdy Roof Suitable For Any Type Building

Connect With Us

Complete the form below and our customer support will contact you shortly.

+62
Address
Head Office
JL. Suryopranoto No. 28
Jakarta 10130 Indonesia.
Telp. (6221) 6321818
Fax : (6221) 632 5649
close
Calculator Call Us Project Whatsapp